Modern Tailoring Ltd. manufactures uniforms and estimates that production
of a particular type of trouser will be 4400 per month.
Each pair of trousers requires 2.5 metres of material costing $8 per metre.
The cost of carrying each metre of material is $2 per annum and
the cost of each order (including receiving costs) is $120.
1. What is the optimal order quantity.
2. Assuming that the material must be ordered in 100 metre rolls,
how many orders will be placed per year?
3. Provided that the orders are placed in the quantities calculated
in (2) above, what are the total costs per annum associated with
acquiring and holding stocks of the material?
4. Compare the total costs calculated in (3) above with total costs
associated with the purchse of the materil in:
a.2000 metre lots; and
b.6000 metre lots.
--
善心人士可以幫幫忙
Modern Tailoring Ltd. manufactures uniforms and estimates that production
of a particular type of trouser will be 4400 per month.
Each pair of trousers requires 2.5 metres of material costing $8 per metre.
The cost of carrying each metre of material is $2 per annum and
the cost of each order (including receiving costs) is $120.
1. What is the optimal order quantity.
2. Assuming that the material must be ordered in 100 metre rolls,
how many orders will be placed per year?
3. Provided that the orders are placed in the quantities calculated
in (2) above, what are the total costs per annum associated with
acquiring and holding stocks of the material?
4. Compare the total costs calculated in (3) above with total costs
associated with the purchse of the materil in:
a.2000 metre lots; and
b.6000 metre lots.
--